Questions Asked in 2023-24
Quantity Estimation And Construction Management (KCE503) — complete question paper · 100 marks · 3 Hours
- aWrite the units for the following materials; (i) Slackest lime (ii) Wood (iii) Bricks (iv) W.C
- bDefine supplementary estimates
- cCalculate cost of carriage of 50,000 bricks by bullock carts, from a distance of 7 km on kuchha road. The cart can make two trips per day and can carry 250 bricks per trip. The wages of bullock cart may be taken as Rs, 50.00 per day including driver
- dWhat are the purposes of rate analysis?
- eWrite the phases of project cycle
- fWhat is the principle of CPM analysis?
- gGive the element of Owing cost
- hWrite factors affecting the selection of tractors. i. Define with neat sketch of total cost curve. j. What do you mean by the financing of projects?
- aFigure shows a room of internal dimensions 4.0 m x 2.5 m. Ca lculate the quantities of the following items of work by center line method. (i) Earthwork in excavation in foundation (ii) Lime concrete in foundation (iii) B rick work in cement mortar ( 1:4) in foundation and plinth (iv) Brick work in cement mortar (1;6) in super structure (v) 2.5 cm thick D.P,C
- bDistinguish between rough cost estimate and detailed estimat e
- cWhat do you mean by Gantt chart? Explain with examples
- dGive the comparison between Wheeled Tractor and Crawler trac tor
- eExplain break even cost chart with neat sketch. Alpha associ ates have the following details. Fixed cost = Rs. 20,00,000, variable cost per limit = Rs. 100, selling price per unit = Rs. 200 Find (i) The break-even sales quantity (ii) The break-even sal es (iii) If the actual production quantity is 60,000 find (a) Contribution (b) Margin of safety
- aPrepare a rough estimate by cubical content method for a pro posed commercial complex for
- amunicipal corporation for the following data, Plinth area = 5 00 m2 /floor, Height of each story=3.5 m, No. of story =G+2, cubical content rate = Rs. 1000 /m3. Provide for a following as a percentage of structural cost (a) Water supply & sanitary arrangement =8% (b)Electrification = 6% (c) Fluctuation of rates = 5% (d) Cont ractors profit = 10% (e) Petty supervision & contingencies= 3%
- bWhat is meant by preliminar y estimates? What documents shoul d be supplied along with this estimate
- aWorkout quantity of dry materi al cost of material and requir ed labour for 150 mm thick R.C.C. slab 1:2:4 and size of slab 9 m x 9 m. Assume labour and materials local rates
- bWhat factors influencing selection of contract system? Diffe rence between SMD and retention money
- aA network diagram shown in fig. find (i) total expected time and variance for each activity (ii) find EST, LST and float (iii) Critical path and duration of project
- bDiscuss in brief the resource allocation problem. What are t he methods of solving the problem?
- aWorkout the hiring cost per hour for the following data abou t a bulldozer. (i) Prime cost of bulldozer = Rs. 48 lakhs (ii) Annual investment = 12 % of avera ge investment (iii) Utilization per year 7200 hours (iv) Salvage value of the bulld ozer = 15% of prime cost (v) Maintenance and repairs = 40% o f annual depreciation (vi) Annua l overhead cost = Rs. 60,000 (vii) Fuel consumption = 30 liters per hour (viii) Cost of fuel Rs. 50 per litre (ix) lubricating oil consumption = 1.8 liters per hour (xi) Cost of lubricating oil = Rs. 250 per liter
- bWith neat sketch explain the concrete mix plant for ready mix concrete
- aA company has purchased equipment whose first cost is Rs. 10 0000 with an estimate life of eight years. The estimated salvage value of the equipment at th e end of its life time is Rs. 20000. Determine the depreciation value and book value at the e nd of various years using the Sum of year’s digits (SOYD) depreciation method
- bDefine equivalence concept? A lso write the principle of equivalence
Question text is extracted from the official AKTU question paper PDF above. Hindi translations are omitted — every question is printed in English in the original paper. Last verified: 2026-08-23.
Repeated Questions — KCE503
Questions that appeared in more than one session, found by comparing 2 years of Quantity Estimation And Construction Management papers (2022-23, 2023-24)
Define supplementary estimates
Appeared in: 2022-23 · 2023-24
What are the purposes of rate analysis?
Appeared in: 2022-23 · 2023-24
Quantity Estimation And Construction Management — Other Year Papers
AKTU Quantity Estimation And Construction Management PYQs from other sessions
More B.Tech Semester 5 (2023-24) Papers
Other subjects from same semester and session
Syllabus & More PYQs
Paper solve karne se pehle unit-wise syllabus dekh lo